首页> 外文期刊>Tunnels & tunnelling international >New face, new run at Hallandsas
【24h】

New face, new run at Hallandsas

机译:哈兰萨斯(Hallandsas)的新面孔和新运行

获取原文
获取原文并翻译 | 示例
           

摘要

After a stop to completely change the entire cutterhead due to abrasive wear and impact damage, the TBM on the first tube of the Hallandsas rail project in a delicate wetland region of Sweden, has been relaunched on the last leg of its drive.The 10.53m diameter Mixshield (S-246) was launched in October 2005 from the south portal and has progressed 2.5km, or almost halfway, into its drive on first tunnel of the twin tube project. Geology along the alignment is gneiss, amphibolite and dolorite, a range of extremely abrasive rocks with UCS greater than 250MPa.
机译:在由于磨料磨损和冲击损坏而停止完全更换整个刀盘后,位于瑞典一个湿地地区的哈兰德斯铁路项目的第一根管道上的掘进机在其驱动的最后一段路程上重新启动。10.53m直径为Mixshield(S-246)的混合盾构(S-246)于2005年10月从南入口发射升空,在双管项目的第一个隧道中行驶了2.5公里(约一半)。沿线的地质是片麻岩,角闪石和白云石,这是UCS大于250MPa的一系列极具磨蚀性的岩石。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号