Traditionally, tbms for tunnelling projects are procured by the successful contractor. Occasionally projects are procured with a TBM and precast segments already readily available and contractors are left with no other option than to accept whatever the client has ordered for them to work with. When clients develop projects where tunnels are involved, usually extensive evaluations are taking place by client organisations, and/or by consultants to select the appropriate tunnelling methods. Upon many other factors, i.e. surface structures, settlement restrictions, site access and length of tunnel, the right selection is also and importantly dependent on the geo-hydrological conditions along the tunnel alignment. Using the principle of the geotechnical baseline report (GBR) is one good and fair approach for clients and contractors, which when applied appropriately, clearly defines parameters and risk allocation.
机译:传统上,隧道工程的tbms由成功的承包商采购。有时,项目是使用TBM采购的,预制部分已经很容易获得,承包商除了接受客户订购的与其合作的任何东西外,别无选择。当客户开发涉及隧道的项目时,通常客户组织和/或顾问会进行广泛的评估,以选择适当的隧道方法。在许多其他因素的影响下,即地表结构,沉降限制,工地通道和隧道长度,正确的选择也很重要地取决于沿隧道路线的地质水文条件。使用岩土基准报告(GBR)的原则对客户和承包商而言是一种良好且公平的方法,如果适当应用,则可以明确定义参数和风险分配。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号