The mayo b project (Figure 1) arose from the need of the Yukon Energy Corporation (YEC) to increase renewable power sources and meet system-wide load demands, while ensuring that diesel consumed to generate electricity was reduced. Load growth in the Yukon is forecasted due to increases in residential/general service, expanded industrial loads, and potential new mine loads. Power for almost three-quarters of the Territory's 116MW generating system originates from hydroelectric sources. The Mayo B project, completed in 2011, increased installed hydroelectric power generation capacity at this site from approximately 5MW to 15MW. The project displaces diesel generation and results in a reduction in annual greenhouse gas emissions of approximately 25,000 tonnes per year.
机译:mayo b项目(图1)源自育空能源公司(YEC)需要增加可再生能源并满足系统范围的负荷需求,同时确保减少发电所消耗的柴油。预计育空地区的负荷增长将归因于住宅/一般服务的增加,工业负荷的扩大以及潜在的新矿山负荷。该领土116兆瓦发电系统的近四分之三的电力来自水力发电。 Mayo B项目于2011年完成,该站点的水力发电装机容量从大约5MW增加到15MW。该项目取代了柴油发电,每年减少了约25,000吨的年度温室气体排放。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号