Resource scheduling and planning are the strategies required to determine the sequence of activities and resource allocation during tunnel construction. Resource scheduling and planning have been implemented in a new resource model of the Decision Aids for Tunneling (DAT), which are a computer based tool used to simulate tunnel construction. Tunneling plans obtained with the new resource model of the DAT take into account the technical precedence of activities, the resource/space availability, the dynamic status of the process, and the work continuity. In particular, the new resource model of the DAT can provide the optimal tunneling plan, which produces the shortest construction time and the smallest construction cost, and satisfies the special characteristics of tunnel construction such as excavation methods, distance requirements between the headings, and preempting activities (e.g., blasting).
机译:资源调度和计划是确定隧道施工期间活动顺序和资源分配所需的策略。已经在隧道决策辅助(DAT)的新资源模型中实现了资源调度和计划,该模型是一种基于计算机的工具,用于模拟隧道施工。通过DAT的新资源模型获得的隧道计划要考虑到活动的技术优先级,资源/空间可用性,过程的动态状态以及工作的连续性。特别是,DAT的新资源模型可以提供最佳的隧道计划,从而产生最短的施工时间和最小的建造成本,并满足隧道施工的特殊特征,例如开挖方法,航向之间的距离要求和抢先性活动(例如爆破)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号