...
首页> 外文期刊>Transportation Research Record >Design and Construction of a Full-Width, Full-Depth Precast Concrete Deck Slab on Steel Girder Bridge
【24h】

Design and Construction of a Full-Width, Full-Depth Precast Concrete Deck Slab on Steel Girder Bridge

机译:钢梁桥全宽全深度预制混凝土桥面板的设计与施工

获取原文
获取原文并翻译 | 示例
           

摘要

The West Sandusky Street Bridge over I-75 in Findlay, Ohio, consisted of a single 170-ft-span hybrid steel plate girder bridge with a concrete deck. To minimize closure times on West Sandusky Street and reduce traffic delays on I-75 during the bridge's replacement, full-width, full-depth precast concrete deck panels were proposed for the bridge deck construction. The precast deck panels are posttensioned both longitudinally and transversely to minimize cracking and improve durability and are constructed with shear stud pockets to allow for the installation of shear studs after erection and posttensioning. During detail design, a finite element analysis of the bridge deck was carried out to determine the required level of prestress in the deck. A time-dependent analysis was subsequently completed to determine the long-term creep effects and posttensioning losses, including the effects of restraint from the steel girders. A sensitivity analysis determined the optimum curing time required before stressing the longitudinal posttensioning tendons and grouting the shear pockets. The steel plate girders were designed for the long-term creep effects due to the posttensioning of the deck, which imposed additional axial loads and moments on the steel girders. The replacement deck panels were fabricated before bridge demolition and road closure. Bridge construction was completed in fall 2004.
机译:俄亥俄芬德利I-75州际公路上的西桑达斯基街桥,由一个170英尺跨度的混合钢板梁桥和一个混凝土甲板组成。为了最大程度减少West Sandusky街的封闭时间并减少在更换桥梁时I-75上的交通延误,建议在桥面施工中使用全宽,全深度的预制混凝土面板。预制甲板面板在纵向和横向上都进行了预张紧,以最大程度地减少裂缝并提高耐用性,并构造有抗剪栓钉袋,以允许在竖立和后绷带安装抗剪栓钉。在详细设计过程中,对桥面板进行了有限元分析,以确定桥面板中所需的预应力水平。随后完成了与时间有关的分析,以确定长期蠕变效应和后张拉力损失,包括钢梁的约束效应。敏感性分析确定了在对纵向后张预应力筋施加应力和对剪切袋进行灌浆之前所需的最佳固化时间。钢板梁的设计是由于甲板的后张应力而产生的长期蠕变效应,这会给钢板梁施加额外的轴向载荷和力矩。替换的甲板面板是在桥梁拆除和道路封闭之前制造的。桥梁建设于2004年秋季完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号