...
首页> 外文期刊>Transform Magazine >BETTER PROCESSES, RESTFUL SLEEP
【24h】

BETTER PROCESSES, RESTFUL SLEEP

机译:更好的过程,舒适的睡眠

获取原文
获取原文并翻译 | 示例
           

摘要

The BPM system is orthogonal to the IT infrastructure. That is, the IT infrastructure can and does exist without a BPM system, and vice versa. Neither depends on the other, in much the same way that an auto designer's CAD/CAM system does not depend on an IT infrastructure. Auto designers don't deal with the technical plumbing of IT systems, they deal with car frames, engines, wheels and so on. Ditto for business analysts who want to deal directly with business processes.
机译:BPM系统与IT基础架构正交。也就是说,没有BPM系统,IT基础结构可以存在并且确实存在,反之亦然。两者都不依赖,就像汽车设计师的CAD / CAM系统不依赖IT基础架构一样。汽车设计师无需处理IT系统的技术问题,而需要处理车架,发动机,车轮等。想要直接与业务流程打交道的业务分析师的同上。

著录项

  • 来源
    《Transform Magazine》 |2004年第6期|p.23-23|共1页
  • 作者

    Howard Smith Peter Fingar;

  • 作者单位

    HOWaRD SmITH (howard.smith@ontology.org) is chief technology officer of Computer Sciences Corp. and co-chair of the Business Process Management Initiative. PeTeR FInGaR (pfingar@tampabay.rr.com) is an executive partner with the Greystone Group. Fingar and Smith are the authors of Business Process Management: The Third Wave and IT Doesn't Matter - Business Processes Do.;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号