...
首页> 外文期刊>Traffic engineering & control >Approval given for innovlTS - Advance construction to get under way
【24h】

Approval given for innovlTS - Advance construction to get under way

机译:已获得创新的批准-提前进行施工

获取原文
获取原文并翻译 | 示例
           

摘要

Phil Pettitt, InnovlTS CEO, breaks ground on the new innovlTS - ADVANCE city circuit watched by representatives from TRL, MIRA and Advantage West Midlands.rnThe construction of the first phase is expected to open to customers from the global automotive and telecommunications industries and highway operators and authorities in the last Spring of 2010. Four further phases of development are envisaged over the coming years, all of which will fall within the boundaries of the existing MIRA site.
机译:InnovlTS首席执行官Phil Pettitt在新的innovlTS-ADVANCE城市巡回赛上破土动工,TRL,MIRA和Advantage West Midlands的代表观看了这一切。预计第一阶段的建设将向全球汽车和电信行业以及高速公路运营商的客户开放以及在2010年最后一个春季获得授权。在未来几年中,预计将进一步发展四个阶段,所有这些阶段都将落入MIRA现有站点的范围之内。

著录项

  • 来源
    《Traffic engineering & control》 |2009年第9期|395-395|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号