United Group Rail which maintains the Tseung Kwan O (TKD) depot on behalf of the MTR Corporation Limited in Hong Kong has achieveTt a record infinity year-to-month 'Preliminary Passenger Affected Ratio' or PAR with 105 days without any five minute delays to rail operations. This performance measurement is used by MTR to communicate its ability to deliver an efficient on-time service. The Tseung Kwan O Depot services one of the seven lines of the MTR system in Hong Kong and runs from Hong Kong Island to the new town of Tseung Kwan O. In the morning rush hour, the Tseung Kwan O Line needs 15 trains in service to keep 2.7 minute intervals. According to United Group Rail Chief Executive, Andy Summers: "What this record means is that all TKD metro services have operated with delays of less than five minutes for a consecutive period of over 105 days. While this is impressive, what is equally important is that we have managed to produce a reduction in two-minute delays, together with an accompanying reduction in 'overruns' and auto turnaround faults.
展开▼
机译:代表香港地铁有限公司维护将军澳(TKD)仓库的联合集团铁路公司(United Group Rail)取得了创纪录的按年无限的“初步旅客受影响比率”或PAR,105天无延迟五分钟铁路运营。 MTR使用此性能度量来传达其提供高效按时服务的能力。将军澳站是香港地铁系统的七条线之一,从香港岛延伸到新的将军澳。在高峰时段,将军澳线需要15列火车间隔2.7分钟。联合集团铁路首席执行官安迪·萨默斯(Andy Summers)表示:“这一记录的意思是,所有TKD地铁服务的连续运营时间超过105天,不到五分钟。这虽然令人印象深刻,但同样重要的是我们设法减少了两分钟的延迟,并相应地减少了“超限”和自动周转故障。
展开▼