...
首页> 外文期刊>Town and Country Planning >Bring planning back to the future
【24h】

Bring planning back to the future

机译:将计划带回未来

获取原文
获取原文并翻译 | 示例
           

摘要

Development planning is in dire straits. That at least is the view I am getting from the 'shires' of what might loosely be described as 'Wessex'. Local Plans are in a seemingly continuous loop of preparation, consultation, examination and review, which generates thousands of pages of complex, incomprehensible and confusing verbiage, bewildering the professionals almost as much as the few independent third parties who manage to stay the course. There is wholly inadequate co-ordination and collaboration with the plans of neighbouring authorities and bodies, especially with regard to major housing allocations, road and rail transport, and economic development. There are serious shortfalls in the provision of affordable housing and infrastructure, thanks to uncertain and inadequate support from section 106 agreements and the Community Infrastructure Levy in the face of draconian 'viability' tests.
机译:发展计划陷入困境。至少这是我从“郡”那里得到的关于可能被粗略地描述为“ Wessex”的观点。本地计划处于准备,咨询,检查和审查的连续过程中,产生数千页的复杂,难以理解和令人困惑的词汇,使专业人员困惑不解,几乎使设法坚持下去的独立第三方也一样困惑。与邻国当局和机构的计划之间的协调和协作完全不足,特别是在主要住房分配,公路和铁路运输以及经济发展方面。由于面临严苛的“可行性”测试,第106条协议和社区基础设施征费的不确定性和不足,在提供负担得起的住房和基础设施方面存在严重不足。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号