A Software System Used for Load Distribution at a Combined Heat and power Plant with the Complex Mix of the Equipment and Complex Schemes of Heat and Electric power Supply

机译:具有复杂设备组合和热电供电方案的热电联产厂负荷分配软件系统

获取原文
获取原文并翻译 | 示例
           

摘要

The authors describe various approaches to construction of an algorithm for the solution of the problem of load distribution at a combined heat and power (CHP) plant with the complex mix of the equipment and complex schemes of heat and electrical energy supply on the basis of which the software system has been developed. Methods of obtaining energy characteristics of the equipment used for solving the problem of load distribution were studied. The results of the implementation of the software system for load distribution at the CHP-23 plant belonging to OAO Mosenergo are given. Realization of recommendations on maintaining an operational mode of the equipment with due regard for its optimal loading makes it possible to obtain fuel savings of up to 1 %.
机译:作者描述了构建算法的各种方法,该算法用于解决热电联产(CHP)工厂中的负荷分配问题,其中包括设备的复杂混合以及热电供应的复杂方案。软件系统已经开发。研究了用于解决负荷分配问题的设备的能量特性的获取方法。给出了属于OAO Mosenergo的CHP-23工厂的负荷分配软件系统的实施结果。在适当考虑设备的最佳负载的情况下实现有关维持设备运行模式的建议,可以节省多达1%的燃料。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号