首页> 外文期刊>The Structural Engineer >Some problems with arch bridge assessment and potential solutions
【24h】

Some problems with arch bridge assessment and potential solutions

机译:拱桥评估的一些问题和可能的解决方案

获取原文
获取原文并翻译 | 示例
           

摘要

Arches with low dead load, and therefore low prestress may be susceptible to traffic damage under loads currently applied. Using current assessment rules these bridges appear to be safe. Using a distribution model which is more in line with anticipated behaviour is capable of yielding results which allow an engineer to differentiate effectively between bridges which are safe and those which may be in danger. A true representation of behaviour is not yet possible and may never be. It is a matter of some urgency that the potential for over estimation of capacity is acknowledged and research put in hand to investigate the causes thoroughly and test the models proposed here. In the meantime, it is unsafe, and therefore inadmissible to suggest that the current model should be used until a better one is proved. It would be better to give no guidance at all, and allow individual engineers to make their own judgments than to continue to offer guidance which is known to be, at best, flawed.
机译:在当前施加的载荷下,具有较低静载荷的拱门因此具有较低的预应力可能会受到交通损坏的影响。使用当前的评估规则,这些桥梁似乎是安全的。使用更符合预期行为的分布模型能够产生结果,使工程师可以有效地区分安全桥梁和可能处于危险之中的桥梁。行为的真实表示尚不可能,而且永远不可能。迫在眉睫的是,人们认识到潜在地估计容量的过高潜力,并进行了研究以彻底调查原因并测试此处提出的模型。同时,这是不安全的,因此在建议证明更好的模型之前,建议使用当前模型是不可接受的。最好不要给出任何指导,而要让各个工程师自己做出判断,而不是继续提供充其量是有缺陷的指导。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号