首页> 外文期刊>The Railway Magazine >Subway shut for emerqencv repairs
【24h】

Subway shut for emerqencv repairs

机译:地铁关闭以进行紧急维修

获取原文
获取原文并翻译 | 示例
           

摘要

A section of the Glasgow Subway was closed for five days in June for emergency repairs to the tunnel lining. Both lines were closed between Cowcaddens and Buchanan Street stations on June 3, when planned repair work uncovered a larger problem. During the closure, shuttle trains ran between Buchanan Street and Govan, and Govan and St George's Cross, with buses filling the gap. The inner (anticlockwise) circle reopened on June 6 followed by the outer (clockwise) circle on June 8.
机译:格拉斯哥地铁的一部分于6月关闭了5天,以进行隧道衬砌的紧急维修。当计划的维修工作发现了一个更大的问题时,两条线路都于6月3日在Cowcaddens和Buchanan Street车站之间关闭。在关闭期间,穿梭列车在Buchanan街和Govan之间以及Govan和St George's Cross之间运行,公共汽车填补了空白。内圈(逆时针)在6月6日重新打开,外圈(顺时针)在6月8日重新打开。

著录项

  • 来源
    《The Railway Magazine》 |2013年第1348期|95-95|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号