首页> 外文期刊>The Railway Magazine >Operations Track Record
【24h】

Operations Track Record

机译:营运记录

获取原文
获取原文并翻译 | 示例
           

摘要

THE Rail Head Treatment season will begin shortly, and wagons are being moved from York in readiness. Class 57 No. 57002 moved a rake to Kingmoor on August 28, while No. 57007 took another rake to Stowmarket on the same day. These were followed on August 31, when Class 56 No. 56078 took a further rake to Shrewsbury. On September 3, Class 66 Nos. 66708 and 66775 were noted passing Kensington Olympia top-and-tailing a formation working from Tonbridge Yard to Bishop Stortford.
机译:铁轨头的治疗季节即将开始,货车准备从约克转移过来。 57002号57002在8月28日将一把耙子移到Kingmoor,而57007号在同一天又将另一耙子移到了Stowmarket。随后,8月31日,第56类第56078号又进一步耙入什鲁斯伯里(Shrewsbury)。 9月3日,第66课编号66708和66775被注意到经过肯辛顿奥林匹亚运动,并从尾桥(Tonbridge Yard)到达Bishop Stortford。

著录项

  • 来源
    《The Railway Magazine》 |2018年第1411期|105-109|共5页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号