首页> 外文期刊>The Engineer >The Engineer Online
【24h】

The Engineer Online

机译:在线工程师

获取原文
获取原文并翻译 | 示例
           

摘要

Umeco has reported promising results for the period from 1 October 2008 to the end of January 2009. The company reported trading in line with expectations, with its order book at £202.3m compared with £206.2m in September 2008. Results have been aided by Umeco's Advanced Composites Group, which recently secured a contract to provide phenolic prepreg materials for a Ministry of Defence vehicle-armour project. Umeco Composites generally remains buoyant despite the effects of industrial action at Boeing and delays to the US aerospace giant's 787 programme.
机译:Umeco报告称其在2008年10月1日至2009年1月末期间的业绩令人鼓舞。该公司报告的交易与预期相符,订单额为2.023亿英镑,而2008年9月为2.620亿英镑。 Umeco的Advanced Composites Group最近获得了一份合同,该合同为国防部的车辆装甲项目提供酚醛预浸料。尽管波音公司采取了工业行动,并推迟了美国宇航巨头的787计划,但Umeco Composites总体上仍然保持活跃。

著录项

  • 来源
    《The Engineer》 |2009年第7766期|6|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号