...
首页> 外文期刊>The Engineer >EUCLID TELESCOPE AT FINAL STAGES
【24h】

EUCLID TELESCOPE AT FINAL STAGES

机译:EUCLID望远镜最后阶段

获取原文
获取原文并翻译 | 示例
           

摘要

Assembly is now underway on the main telescope of Euclid, the highest-performance optical instrument that Airbus has ever constructed. The Euclid mission aims to map the geometry of the "dark universe" - the regions which are too cold to emit visible light. "With the ultimate goal to understand the origin of the Universe's accelerating expansion, Euclid will map the geometry of the dark universe with unprecedented accuracy," said mission project manager Giuseppe Racca. The spacecraft, operating at temperatures of 100K, will collect a different high-resolution image every 80 minutes for six years.
机译:现在,正在使用Euclid的主要望远镜进行组装,这是空中客车公司制造的性能最高的光学仪器。 Euclid任务旨在绘制“黑暗宇宙”的几何形状-太冷而无法发出可见光的区域。任务项目经理朱塞佩·拉卡(Giuseppe Racca)说:“以了解宇宙加速膨胀的起源为最终目标,欧几里得将以前所未有的精度绘制黑暗宇宙的几何图。”该航天器的工作温度为100K,将在六年中每80分钟收集一次不同的高分辨率图像。

著录项

  • 来源
    《The Engineer》 |2020年第7913期|10-10|共1页
  • 作者

    STUART NATHAN;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号