首页> 外文期刊>The energy daily >DOE, Idaho Reach Accord On Idaho Laboratory Cleanup
【24h】

DOE, Idaho Reach Accord On Idaho Laboratory Cleanup

机译:美国能源部,爱达荷州达成爱达荷州实验室清理协议

获取原文
获取原文并翻译 | 示例
           

摘要

In a settlement that resolves a six-year legal dispute, the state of Idaho and the Energy Department announced Tuesday they have agreed on a plan for the disposal of tons of plutonium and other radioactive waste from a vast landfill at the Idaho National Laboratory.rnThe agreement, announced in Boise by Idaho Gov. C.L. "Butch" Otter (R) and DOE Assistant Secretary for Environmental Management James Rispoli, implements a 2006 federal court order that requires DOE to remove all the radioactive and toxic waste in portions of the laboratory's sprawling Subsurface Disposal Area, which since 1952 has received a wide variety of wastes from past nuclear weapons operations at the Idaho site as well as DOE's Rocky Flats plutonium site in Colorado.
机译:为了解决长达六年的法律纠纷,爱达荷州和能源部周二宣布,他们已商定了一项在爱达荷州国家实验室的一个大型垃圾填埋场处置吨tons和其他放射性废物的计划。协议,由爱达荷州州长在博伊西宣布“ Butch” Otter(R)和DOE环境管理助理部长James Rispoli实施了2006年的联邦法院命令,该命令要求DOE清除实验室蔓延的地下处置区域(自1952年以来已经获得了一部分)中的所有放射性和有毒废物。过去在爱达荷州和美国能源部位于科罗拉多州的洛矶平原p工厂的核武器作业产生的各种废物。

著录项

  • 来源
    《The energy daily》 |2008年第126期|13|共2页
  • 作者

    CHRIS HOLLY;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号