【24h】

Showcase

机译:展示柜

获取原文
获取原文并翻译 | 示例
           

摘要

Avanti Systems has launched the C-joint, to provide a clear yet robust finish for jointing both fully single and double glazed partitioning. It is a near invisible dry joint, sandwiched neatly between two profiled glass panels. Saving vital time on site, the C-Joint is installed at the same time as the glass.rnCorus Colorcoat HPS200 Ultra and Colorcoat Prisma were specified for the Ravenscraig national indoor sports centre. The project, in Motherwell, Scotland, is on the old British Steel Ravenscraig site, so it was fitting that pre-finished steel from the former British Steel company was used.
机译:Avanti Systems推出了C型接头,为连接完全单层和双层玻璃隔断提供了清晰而坚固的表面。它是一个几乎看不见的干接缝,整齐地夹在两个压型玻璃面板之间。 C-Joint与玻璃杯同时安装,可节省现场的关键时间。rnCorus Colorcoat HPS200 Ultra和Colorcoat Prisma被指定为Ravenscraig国家室内运动中心。该项目位于苏格兰马瑟韦尔(Motherwell),位于旧的英国Steel Ravenscraig工地上,因此使用前英国钢铁公司(British Steel Company)的预成品钢材进行安装非常合适。

著录项

  • 来源
    《The architects' journal》 |2010年第3speca期|50-51|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号