首页> 外文期刊>The architects' journal >COLIN STANSFIELD SMITH ON THE REVIEW INTO BUILDING SCHOOLS AND THE RETURN TO STANDARDISED SPECIFICATIONS (AJ 15.09.11)
【24h】

COLIN STANSFIELD SMITH ON THE REVIEW INTO BUILDING SCHOOLS AND THE RETURN TO STANDARDISED SPECIFICATIONS (AJ 15.09.11)

机译:柯林·史密斯(Colin Stefand Smith)对建筑学校的审查以及对标准规格的回归(AJ 15.09.11)

获取原文
获取原文并翻译 | 示例
           

摘要

Reading the James Review was like experiencing deja vu - a thoroughly depressing repeat of what we did in the '50s and '60s. My arrival in Hampshire in 1973 coincided with an emerging dissatisfaction with how the county procured schools. Hampshire had become what I called the working class for SCOLA-system built schools. In the 20 years before my arrival, several hundred schools were generated in this system. The rationale for the system, with its dry construction, factory-made components, bulk purchasing and basic flexibility, was totally convincing. However, the main justification was what could be achieved in the time available.
机译:读《詹姆斯评论》就像经历一场似曾相识的经历-彻底压制我们在50年代和60年代所做的重复。我于1973年到达汉普郡时,恰逢该郡对学校的购买方式产生了不满。汉普郡已经成为我所谓的SCOLA系统建造学校的工人阶级。在我到达之前的20年中,该系统建立了数百所学校。该系统的基本原理,包括干式结构,工厂制造的组件,批量购买和基本的灵活性,完全令人信服。但是,主要的理由是在现有时间内可以实现的目标。

著录项

  • 来源
    《The architects' journal》 |2013年第24期|13-13|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号