【24h】

Letters

机译:字母

获取原文
获取原文并翻译 | 示例
           

摘要

Letters should be received by 10am on the Monday before publication. The AJ reserves the right to edit letters. The letter of the week's author will receive a bone china AJ mug. All the talk of building monitoring (Bridge the gap, AJ 25.04.13) is a step in the right direction, but it adds credence to the false idea that operational energy is the all-important factor. Tom Woolley points out that the common misconception of embodied energy as a horizontal line on a graph of energy vs time, that is then cancelled by an operational line when the two cross (as set out by Sustainable Homes in 1999), has been demolished by research carried out at Finland's Aalto University and the 'carbon spike problem'.
机译:信件应在出版前的星期一上午10点之前收到。 AJ保留编辑信件的权利。本周作者的来信将收到一个骨瓷AJ马克杯。关于建筑物监控的所有讨论(缩小差距,AJ 25.04.13)都是朝着正确方向迈出的一步,但它增加了人们对错误的观念的信任,即运营能源是最重要的因素。汤姆·伍利(Tom Woolley)指出,普遍存在的误解是将能量体现为能量与时间的关系图上的水平线,当消除了两个交叉点(如1999年可持续住房局提出的)时,一条操作线便消除了这种误解芬兰阿尔托大学(Aalto University)进行的研究和“碳峰值问题”。

著录项

  • 来源
    《The architects' journal》 |2013年第18期|24-24|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号