...
首页> 外文期刊>TCS&D >St. Modwen completes final phase at pioneering Doncaster Park in partnership with Hoermann UK
【24h】

St. Modwen completes final phase at pioneering Doncaster Park in partnership with Hoermann UK

机译:St. Modwen完成了与Hoermann UK合作的唐卡斯特公园的最终阶段

获取原文
获取原文并翻译 | 示例
           

摘要

Housing 250,000sq. ft of prime industrial warehousing space, St. Modwen Park Doncaster continues to push forward the standard for high quality warehousing in South Yorkshire. The recent completion of the speculative development of Phase 3 improves on the design principles of previous phases, to deliver three separate units of high specification speculative warehouses on the established 27 acre business park. Located near the M18 and less than 10 miles from Doncaster Sheffield Airport, St. Modwen Park Doncaster already provides some of the nation's leading energy, transport and manufacturing providers with state-of-the-art warehousing solutions.
机译:住房250,000升。 Prime工业仓储空间FT,圣莫肯唐卡斯特继续推进南约克郡的高品质仓储标准。最近完成第3阶段的投机发展提高了先前阶段的设计原则,以在已建立的27英亩商业园区提供三个单独的高规格投机仓库单位。圣莫特沃特诺卡斯特距离唐卡斯特谢菲尔德机场距离M18附近,距离Doncaster Sheffield机场不到10英里,已经提供了全国领先的能源,运输和制造商,拥有最先进的仓储解决方案。

著录项

  • 来源
    《TCS&D》 |2020年第4期|30-30|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号