首页> 外文期刊>Structural concrete >Deformation of continuous reinforced concrete beams during patch repair
【24h】

Deformation of continuous reinforced concrete beams during patch repair

机译:修补过程中钢筋混凝土连续梁的变形

获取原文
获取原文并翻译 | 示例
           

摘要

This paper describes an experimental and numerical investigation examining the effect of reinforcement exposure during the patch repair process on the behaviour of continuous beams. Particular attention is paid to moment transfer and change in strain patterns during concrete breakout. The test programme embraced a range of parameters including the length and position of breakout and a variety of reinforcement arrangements. Moment transfer during concrete breakout was monitored to assess whether breakout at one location would cause overstressing in other parts of the structure. Results from tests and numerical analysis show increases in section deformations away from the breakout were small when compared to those within the breakout length. It is surmised that there is little danger of overstraining in locations away from the breakout zone while breakout does not extend past a point of contraflexure.
机译:本文描述了一项实验和数值研究,以检查补片修复过程中钢筋暴露对连续梁性能的影响。特别要注意混凝土破裂过程中的矩传递和应变模式的变化。测试程序包含一系列参数,包括突围的长度和位置以及各种加固布置。监测混凝土破裂过程中的力矩传递,以评估某一位置的破裂是否会在结构的其他部分引起过大的应力。测试和数值分析的结果表明,与突破长度内的变形相比,远离突破的截面变形的增加很小。据推测,在突破区域之外的位置几乎没有过度应变的危险,而突破不会延伸超过对折点。

著录项

  • 来源
    《Structural concrete》 |2010年第3期|P.149-160|共12页
  • 作者

    J. Cairns; E. Coakley;

  • 作者单位

    Heriot Watt University, Edinburgh, UK;

    rnCoventry University, Coventry, UK;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号