...
首页> 外文期刊>Structural concrete >Design according to MC2010 of a fibre-reinforced concrete tunnel in Monte Lirio, Panama
【24h】

Design according to MC2010 of a fibre-reinforced concrete tunnel in Monte Lirio, Panama

机译:根据MC2010的设计,巴拿马蒙特里里奥的纤维增强混凝土隧道

获取原文
获取原文并翻译 | 示例
           

摘要

This paper discusses the possibility of using precast tunnel segments in fibre-reinforced concrete without traditional reinforcement. The case study of a hydraulic tunnel in Monte Lirio, Panama, excavated with a tunnel boring machine (TBM) by SELI S.p.A., has been analysed.The segments were designed according to the draft of Model Code 2010. In order to achieve the required performance and to optimize the structural behaviour, three different types of steel fibre were considered in the research. The design was backed up by full-scale tests on precast segments. In particular, 18 full-scale tests were performed, including point load tests simulating the thrust of the TBM and bending tests. The results show the good behaviour of the elements and indicate the fibre-reinforced concrete suitable for the precast elements.
机译:本文讨论了在没有传统加固的情况下在纤维增强混凝土中使用预制隧道段的可能性。以SELI SpA公司的隧道掘进机(TBM)开挖的巴拿马蒙特利里奥液压隧道为例,进行了分析。根据2010版标准草案设计了各段。为了达到要求的性能为了优化结构性能,研究中考虑了三种不同类型的钢纤维。该设计得到了预制路段的全面测试的支持。特别是,进行了18次全面测试,包括模拟TBM推力的点载荷测试和弯曲测试。结果表明该元件具有良好的性能,并表明该纤维增强混凝土适合于预制元件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号