首页> 外文期刊>Space news >Manufacturing Issues Plague James Webb Space Telescope
【24h】

Manufacturing Issues Plague James Webb Space Telescope

机译:制造问题瘟疫詹姆斯·韦伯太空望远镜

获取原文
获取原文并翻译 | 示例
           

摘要

Manufacturing difficulties plagued major elements of the James Webb Space Telescope this year, forcing prime contractor Northrop Grumman Aerospace Systems to rebuild key structural elements declared unfit for flight while continuing to grapple with a persistently problematic cryogenic compressor needed to keep JWST's infrared sensors cold. Despite the latest setbacks, launch remains on track for October 2018, Eric Smith, JWST's deputy program manager, told the National Research Council's Committee on Astronomy and Astrophysics at a Nov. 4 meeting in Irvine, California. The structural elements that had to be rebuilt were the pair of roughly 10-meter-long Unitized Pallet Structures that unfold in orbit to provide a frame for the ultrathin sun shield that shades JWST's infrared instruments. During launch, the carbon-composite Unitized Pallet Structures protect the sun shield from vibration damage.
机译:制造困难困扰着詹姆斯·韦伯(James Webb)太空望远镜的主要部件,迫使总承包商诺斯罗普·格鲁曼航空系统(Northrop Grumman Aerospace Systems)重建了宣布不适合飞行的主要结构部件,同时继续应对持续存在问题的低温压缩机,以保持JWST红外传感器的低温。尽管有最新的挫折,但JWST副项目经理埃里克·史密斯(Eric Smith)在11月4日于加利福尼亚州尔湾举行的会议上告诉国家研究委员会的天文学和天体物理学委员会时,发射仍有望在2018年10月进行。必须重建的结构元件是一对大约10米长的组合式托盘结构,它们在轨道上展开,从而为遮盖JWST红外仪器的超薄遮阳罩提供了框架。在发射过程中,碳复合材料整体式托盘结构可保护遮阳板免受振动损坏。

著录项

  • 来源
    《Space news》 |2014年第45期|4-4|共1页
  • 作者

    DAN LEONE;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号