首页> 外文期刊>Solar Energy >Pooling the cable: A techno-economic feasibility study of integrating offshore floating photovoltaic solar technology within an offshore wind park
【24h】

Pooling the cable: A techno-economic feasibility study of integrating offshore floating photovoltaic solar technology within an offshore wind park

机译:汇集电缆:一种技术经济可行性研究,在海上风园内整合海上浮动光伏太阳能技术

获取原文
获取原文并翻译 | 示例
           

摘要

In this paper, a techno-economic analysis is performed to assess the feasibility of adding an offshore floating solar farm to an existing Dutch offshore wind farm in the North Sea, under the constraint of a certain fixed cable capacity. The specific capacity of the cable that connects the offshore park to the onshore grid is not fully used due to the limited capacity factor of the wind farm. The principle of cable pooling allows to add floating solar capacity. Using weather data it is found that adding solar capacity leads to forced curtailment due to the cable capacity, but this is quite limited as result of the anti-correlation of the solar and wind resource. For the economic analysis, different scenarios regarding subsidy measures are considered for the calculation of net present value and levelized cost of electricity. Also the optimum additional PV capacity for each scenario is computed. The results show that with higher cost per Wp, optimum PV capacity decreases, but more favourable subsidies lead to higher optimized PV capacities. As the aim of the paper is not limited to a case study a methodology is developed for generalization of the techno-economic analysis of a hybrid solar/wind park. In this generalization, the initial investment, system degradation, cable capacity, number of hours when each system is active, and energy price, are implemented to compute the optimum PV capacity regarding the net present value as an indicator for economic analysis of the project.
机译:在本文中,进行了技术经济分析,以评估在某种固定电缆容量的限制下,评估将海上浮动太阳能电池添加到现有荷兰海上风电场的可行性。由于风电场的有限容量因子,连接到船体网格的电缆的具体容量不会充分利用。电缆池原理允许增加浮动太阳能能力。使用天气数据,发现由于电缆容量,添加太阳能容量导致强制缩减,但由于太阳能和风力资源的反相关导致这相当有限。对于经济分析,有关补贴措施的不同情景被认为计算净目前价值和电力稳定性成本。计算每个场景的最佳额外PV容量也是计算的。结果表明,随着每场WP成本更高,最佳PV容量降低,但更有利的补贴导致更高的PV容量。由于本文的目的不仅限于案例研究,因此开发了一种方法,用于泛化混合动力车太阳能/风电场的技术经济分析。在这一概括中,初始投资,系统退化,电缆容量,每种系统都处于活动状态的小时数,和能源价格,实施,以将关于净现值的最佳PV容量计算为项目的经济分析的指标。

著录项

  • 来源
    《Solar Energy》 |2021年第5期|65-74|共10页
  • 作者单位

    Univ Utrecht Copernicus Inst Princetonlaan 8A NL-3584 CB Utrecht Netherlands;

    Oceans Energy Valkenburg Airport Bldg 396 Wassenaarseweg 75 NL-2223 LA Katwijk Netherlands;

    Oceans Energy Valkenburg Airport Bldg 396 Wassenaarseweg 75 NL-2223 LA Katwijk Netherlands;

    Oceans Energy Valkenburg Airport Bldg 396 Wassenaarseweg 75 NL-2223 LA Katwijk Netherlands;

    Rijkswaterstaat Postbus 2232 NL-3500 GE Utrecht Netherlands;

    Rijkswaterstaat Postbus 2232 NL-3500 GE Utrecht Netherlands;

    Univ Utrecht Copernicus Inst Princetonlaan 8A NL-3584 CB Utrecht Netherlands;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Offshore photovoltaics; Feasibility study; Cable pooling; Economic analysis; Offshore wind;

    机译:离岸光伏;可行性研究;电缆汇集;经济分析;海上风;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号