首页> 外文期刊>Soils and foundations >Delayed installation of piles in consolidating soil
【24h】

Delayed installation of piles in consolidating soil

机译:延迟安装桩以加固土壤

获取原文
获取原文并翻译 | 示例
           

摘要

The current general accepted view is that the delayed installation of piles after the commencement of consolidation leads to a reduction of drag load acting on piles. Despite the extensive studies reported in the literature, no work that focussed on the quantitative effect of delayed installation of piles after the commencement of the consolidation on pile behavior was reported. A study on the effect of the delayed pile installation after the commencement of the consolidation is undertaken using a load transfer theory. Pile-soil slip is accounted for by limiting shear stress at the pile-soil interface to the average undrained shear strength of the consolidating soil. The effect of pile-soil slip in limiting the drag load is accounted for once the location of the neutral plane resulting from the delayed pile installation after the commencement of the consolidation is known. Contrary to the current generally accepted understanding that delayed installation of piles after the commencement of the consolidation will lead to a reduction of drag load on such piles, the present study finds that the drag load on piles may not be reduced for consolidating soft clay with two ways drainage or one way bottom drainage conditions. (C) 2019 Production and hosting by Elsevier B.V. on behalf of The Japanese Geotechnical Society.
机译:当前普遍接受的观点是,在固结开始后,桩的延迟安装会减少作用在桩上的拖曳载荷。尽管在文献中进行了广泛的研究,但没有报告集中在固结开始后延迟安装对桩行为的量化影响方面的工作。使用荷载传递理论对固结开始后延迟桩的安装效果进行了研究。桩土滑移是通过将桩土界面处的剪应力限制为固结土的平均不排水抗剪强度来解决的。一旦知道了固结开始后由于桩安装延迟而导致的中性面的位置,便可以说明桩土滑移对限制拖曳载荷的影响。与当前普遍接受的理解相反,即在固结开始后延迟安装桩将导致此类桩的拖曳载荷减少,本研究发现,用两种方法固结软土不会降低桩上的曳引载荷。单向排水或单向排水的条件。 (C)2019年由Elsevier B.V.代表日本岩土工程学会制作和主持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号