...
首页> 外文期刊>SNL Energy Coal Report >CAISO seeks to allow certain generators to downsize projects
【24h】

CAISO seeks to allow certain generators to downsize projects

机译:CAISO寻求允许某些发电机缩减项目规模

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The California ISO wants FERC to approve a plan to give certainngenerators in its interconnection queue a chance to downsize theirnprojects.nSeveral generators have determined that for their projects to bencommercially viable, they will have to be built at lower capacitynlevels than those stated in their interconnection requests, the CAISOnexplained. But because the existing downsizing options are toonlimited, the ISO asked FERC to approve tariff revisions offering morenalternatives.
机译:加州ISO希望FERC批准一项计划,以使互连队列中的某些发电机有机会缩减其项目规模.n数家发电商已经确定,为使其项目在商业上可行,它们必须以比其互连请求中所述容量更低的容量水平建造。 ,CAISOn解释了。但是,由于现有的缩小规模选项是无限的,因此ISO要求FERC批准提供更多替代方案的关税修订。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号