Construction of the 2004 Treasure Island/Long Key portion of the Pinellas County Federal Nourishment Project was interrupted four times by the passage of Hurricanes Charley, Frances, Ivan, and Jeanne, providing numerous coastal management challenges. An ambitious monitoring program conducted before, during, and immediately after construction quantified shoreline and volume changes within a few days following each storm. Project managers utilized these data in post-hurricane decision making. The most dramatic erosion occurred along the Upham Beach (Long Key) segment of the project, which was completed five days prior to the passage of Frances. This segment lost up to 60 m of shoreline during the month of September 2004, an amount nearly equivalent to one year of erosion documented during previous nourishments. Based on these data, Pinellas County, the local sponsor, requested emergency storm repairs for Upham Beach, Pass-a-Grille Beach (also on Long Key), and Sunset Beach on Treasure Island. Because of resourceful interagency coordination and accessible pre- and post-storm data, repairs were initiated immediately following the storms. Despite the destructive impacts of the four hurricanes, the beaches of Sunset Beach and Upham Beach were returned to the original design templates, and an unscheduled emergency repair nourishment was completed on Pass-a-Grille Beach. A series of management and policy recommendations for local coastal managers are provided based on the experience gained during this unique project.
机译:皮涅拉斯县联邦营养项目2004年金银岛/长关键部分的建设因飓风查理,弗朗西丝,伊凡和珍妮的通过而中断了四次,这给沿海管理带来了诸多挑战。在施工前,施工中和施工后立即进行的雄心勃勃的监测计划量化了每次暴风雨后几天内的海岸线和流量变化。项目经理在飓风后的决策中利用了这些数据。最剧烈的侵蚀发生在该项目的Upham海滩(长键)段,该段段在Frances通过前五天完成。在2004年9月期间,该路段损失了多达60 m的海岸线,几乎相当于先前营养期间记录的一年的侵蚀。根据这些数据,当地赞助商Pinellas县要求对Upham海滩,Pass-a-Grille海滩(也在Long Key上)和Treasure Island的Sunset Beach进行紧急风暴维修。由于机构间进行了充分的协调,并获得了暴风雨前后的数据,因此在暴风雨后立即开始了维修工作。尽管受到了四场飓风的破坏性影响,日落海滩和阿普姆海滩的海滩仍恢复了原始设计模板,并且在Pass-a-Grille海滩上完成了计划外的紧急维修营养。根据在这个独特项目中获得的经验,为当地沿海管理者提供了一系列管理和政策建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号