首页> 外文期刊>Ships monthly >Headlines and deadlines
【24h】

Headlines and deadlines

机译:标题和截止日期

获取原文
获取原文并翻译 | 示例
           

摘要

The us navy has capitalised on lower than expected tenders for a major contract to design and build up to 55 warships. Instead of an original intention to order a batch of ten Littoral Combat Ships of the winning design from two competing consortia for $4.8 billion, the navy realised they could get better value by ordering 20 ships, ten from each, for the same amount of money. However, the late change of plan was not a formality, as such a move required congressional approval. This only came at the eleventh hour. Given the go-ahead, the navy placed orders with shipyards from each consortia for an additional vessel with options for nine more.
机译:美国海军已经利用低于预期的价格获得了设计和建造多达55艘军舰的主要合同。海军原本没有打算以48亿美元的价格从两个竞争的财团订购10艘获胜设计的滨海战斗舰,但海军意识到,以相同的价格订购20艘(每艘10艘)战舰可以得到更好的价值。但是,较晚的计划变更不是正式的,因为此举需要国会批准。这只是在第十一个小时。鉴于批准,海军向每个联合体的造船厂订购了另外一艘船,并有另外九艘的选择权。

著录项

  • 来源
    《Ships monthly》 |2011年第3期|p.15|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号