首页> 外文期刊>Sea Power >Countdown to SSC
【24h】

Countdown to SSC

机译:SSC倒计时

获取原文
获取原文并翻译 | 示例
           

摘要

The clock is ticking on a contract award for the Ship-to-Shore Connector (SSC) as the Navy seeks to replace its decades-old fleet of Landing Craft, Air Cushion (LCAC) hovercraft used for ferrying cargo and personnel to shore in difficult landing environments.The Navy finally released a draft request for proposals for the SSC on March 1, months behind schedule due to what officials have said were administrative issues, and pledged in the Federal Business Opportunities announcement to release the full version later that month. However, as of press time May 13, no such document has been released in advance of a contract award scheduled for later this year, although the Navy insists there will be no delay to the program as a result.
机译:海军正在寻求替换其数十年来使用的登陆艇,气垫(LCAC)气垫船舰队,该舰队用于将货物和人员运送到困境中,船上的Shore-to-Shore连接器(SSC)获得了合同由于官员们所说的是行政问题,美国海军终于在3月1日发布了SSC的征求建议书草案,由于官员所说是行政问题,因此推迟了几个月,并保证在当月晚些时候发布的《联邦商业机会》公告中发布完整版本。然而,截至5月13日,尽管海军坚称不会拖延该计划,但尚未在计划于今年晚些时候授​​予合同之前发布任何此类文件。

著录项

  • 来源
    《Sea Power》 |2011年第6期|p.26-28|共3页
  • 作者

    DANIEL P. TAYLOR;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号