...
首页> 外文期刊>Science of the total environment >Site specific risk assessment of an energy-from-waste thermal treatment facility in Durham Region, Ontario, Canada. Part A: Human health risk assessment
【24h】

Site specific risk assessment of an energy-from-waste thermal treatment facility in Durham Region, Ontario, Canada. Part A: Human health risk assessment

机译:加拿大安大略省达勒姆地区的废热能源热处理设施的现场特定风险评估。 A部分:人类健康风险评估

获取原文
获取原文并翻译 | 示例
           

摘要

The regions of Durham and York in Ontario, Canada have partnered to construct an energy-from-waste thermal treatment facility as part of a long term strategy for the management of their municipal solid waste. This paper presents the results of a comprehensive human health risk assessment for this facility. This assessment was based on extensive sampling of baseline environmental conditions (e.g., collection and analysis of air, soil, water, and biota samples) as well as detailed site specific modeling to predict facility-related emissions of 87 identified contaminants of potential concern. Emissions were estimated for both the approved initial operating design capacity of the facility (140,000 tonnes per year) and for the maximum design capacity (400,000 tonnes per year). For the 140,000 tonnes per year scenario, this assessment indicated that facility-related emissions are unlikely to cause adverse health risks to local residents, farmers, or other receptors (e.g., recreational users). For the 400,000 tonnes per year scenarios, slightly elevated risks were noted with respect to inhalation (hydrogen chloride) and infant consumption of breast milk (dioxins and furans), but only during predicted 'upset conditions' (i.e. facility start-up, shutdown, and loss of air pollution control) that represent unusual and/or transient occurrences. However, current provincial regulations require that additional environmental screening would be mandatory prior to expansion of the facility beyond the initial approved capacity (140,000 tonnes per year). Therefore, the potential risks due to upset conditions for the 400,000 tonnes per year scenario should be more closely investigated if future expansion is pursued.
机译:加拿大安大略省的达勒姆地区和约克地区已经合作建设了一种“垃圾产生能量”热处理设施,作为管理其城市固体废物的长期战略的一部分。本文介绍了对该设施进行的全面人类健康风险评估的结果。该评估基于对基线环境条件的大量采样(例如,空气,土壤,水和生物群样品的收集和分析)以及详细的现场特定模型,以预测与设施相关的87种已确定潜在关注污染物的排放。估计设施的已批准初始运营设计能力(每年14万吨)和最大设计能力(每年40万吨)的排放量。对于每年140,000吨的情景,此评估表明,与设施相关的排放不太可能对当地居民,农民或其他受体(例如娱乐用户)造成不利的健康风险。对于每年40万吨的情景,注意到吸入(氯化氢)和婴儿食用母乳(二恶英和呋喃)的风险略有升高,但仅在预测的“不适状态”(即设施启动,关闭,以及失去空气污染控制措施),代表不寻常和/或短暂的事件。但是,当前的省级法规要求在设施扩展至超出最初批准的能力(每年140,000吨)之前,必须进行额外的环境筛选。因此,如果要进行未来的扩展,则应对40万吨/年情景下的不安定条件造成的潜在风险进行更仔细的调查。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号