...
首页> 外文期刊>Rocky Mountain Construction >Treating Water FOR PHOENIX
【24h】

Treating Water FOR PHOENIX

机译:凤凰水处理

获取原文
获取原文并翻译 | 示例
           

摘要

If you were to ask anybody, "What's the one most important thing you peed in the desert?" The typical answer would most likely be "water." Obviously, you can't do much else without it. That's why the desert region of central Arizona is now the site of North America's largest design-build water project: the $336-million Lake Pleasant Water Treatment Plant, just northeast of Phoenix. The Phoenix metropolitan area has had explosive growth in the last several years, and the trend shows no sign of blowing down. In anticipation of fur-ther population increases and expansion into the city's northern suburbs, the new Lake Pleasant water treatment facility was designed to provide high-quality drinking water for an additional 300,000 homes in the next two decades.
机译:如果您要问任何人,“您在沙漠中撒尿最重要的一件事是什么?”典型的答案很可能是“水”。显然,没有它,您将无能为力。这就是为什么亚利桑那州中部的沙漠地区现在是北美最大的设计建造水项目的所在地:位于凤凰城东北部,耗资3.36亿美元的普莱森特湖水处理厂的原因。凤凰城大都市区在过去几年中呈爆炸性增长,而且这种趋势没有减弱的迹象。预期还会有更多人口涌入城市北部郊区,新的普莱森特湖水处理设施旨在在未来二十年内为另外30万个家庭提供优质饮用水。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号