Unexpected construction delays often result in increased costs to a subcontractor. It is rare indeed to see a subcontractor dispute or claim that does not include a delay component. To be successful, a subcontractor must prove that its contract specified a schedule or completion date. In Keeney Const, v. James Talcott Const. Co., Inc., 45 P.3d 19 (Mont. 2002), the Montana Supreme Court determined that a subcontractor that worked as directed by the general contractor could not recover delay damages. While the case involves building construction, highway contractors can still learn from it.
机译:意外的施工延误通常会导致转包商的成本增加。确实很少见到不包含延迟组件的分包商争议或索赔。为了成功,分包商必须证明其合同规定了时间表或完成日期。在Keeney Const中,诉James Talcott Const。 Co.,Inc.,45 P.3d 19(Mont。2002),蒙大拿州最高法院裁定,按照总承包商的指示工作的分包商无法追回延误赔偿金。虽然此案涉及建筑施工,但公路承包商仍可以从中学习。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号