From ice to rising river levels in 2018 and 2019, working in the Mississippi has been challenging. Construction workers hop onto crew boats each day to get to the work sites, and contractors rely on barges to deliver project equipment and materials such as cranes and concrete. With extraordinary effort and patience, crews have been working through all types of weather to make the new bridge a reality. With the Mississippi River at a major flood stage for 45 days and counting, as well as water levels hitting a record 22.7 ft in May 2019, the high water and swift current have created additional challenges and safety concerns. Certain tasks in the river have been placed on hold for the safety of workers while the contractor focuses on tasks above water level such as decking the westbound bridge and bolting arch segments.
机译:从2018年和2019年的冰川到河水位上升,在密西西比州的工作一直充满挑战。建筑工人每天跳上乘船到达工作地点,承包商依靠驳船运送项目设备和材料,例如起重机和混凝土。经过不懈的努力和耐心,工作人员一直在各种天气条件下工作,以使新桥成为现实。密西西比河处于长达45天的大洪水阶段,并且还在不断增加,并且在2019年5月水位达到创纪录的22.7英尺,高水位和急流带来了更多的挑战和安全隐患。为了保证工人的安全,河中的某些任务被搁置,而承包商则专注于水位以上的任务,例如对西行桥进行铺装和锚固拱段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号