...
首页> 外文期刊>RIBA Journal >Numbers game Uta Werner offers some pointers on efficient resourcing of your projects
【24h】

Numbers game Uta Werner offers some pointers on efficient resourcing of your projects

机译:数字游戏Uta Werner为您的项目的有效资源提供了一些建议

获取原文
获取原文并翻译 | 示例
           

摘要

No matter whether projects are being won or lost, whether you are waiting for planning permission or preparing for a competition with tight deadlines, your workload can hardly ever be predicted over a long period. The juggling of resources and the assembly of teams is a constant challenge if not a nightmare at times. How to respond to immediate team requirements; who to put on which job when options are diverse; how to manage expectations of the team when options are limited; and how to avoid rounds of redundancies when all of a sudden a big project is about to stop, are all dilemmas practices have to struggle with at some point in time.
机译:无论项目是输还是赢,无论您是在等待计划许可还是在紧迫的期限内准备比赛,都很难长期预测您的工作量。有时甚至不是一场噩梦,资源的浪费和团队的聚集是一个持续的挑战。如何响应团队的即时需求;当选择多种多样时,谁来从事什么工作;当选择有限时,如何管理团队的期望;以及当一个大项目突然停止时如何避免重复裁员,都是所有困境在某个时间点都需要解决的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号