...
首页> 外文期刊>Restoration ecology >Geomorphic Responses to Interim Hydrology Following Phase Ⅰ of the Kissimmee River Restoration Project, Florida
【24h】

Geomorphic Responses to Interim Hydrology Following Phase Ⅰ of the Kissimmee River Restoration Project, Florida

机译:佛罗里达基西米河修复工程第一阶段对临时水文的地貌响应

获取原文
获取原文并翻译 | 示例
           

摘要

Channelization of the Kissimmee River eliminated flow through the river channel, which allowed the formation of a largely organic deposition layer (ODL) on the river channel bed and stopped active sand transport needed to maintain point bars on meander bends. In 2001, completion of the first phase of dechannelization for the Kissimmee River Restoration Project (KRRP) reestablished flow to the river channel in the Phase Ⅰ area. This study evaluated changes in the ODL and the number of meander bends with active point bar development (MBPB) following Phase Ⅰ of dechannelization. Evaluations involved comparing interim measurements made after flow was reestablished to the river channel in the Phase Ⅰ area but before full completion of KRRP with (a) baseline measurements made before dechannelization and (b) predicted changes based on reference measurements representing the pre-channelization system. ODL thickness was measured in core samples on fixed transects perpendicular to the river channel. The ODL was thinner during the Interim Period than the Baseline Period and this decrease exceeded the expected change predicted from the reference condition. MBPB was assessed with aerial photography. MBPB increased from the baseline measurement of 0 bends to interim measurements of 27 bends in 2002 and 72 bends in 2009, approximating the increase predicted from the reference condition. The decrease in ODL thickness and the increase in MBPB to levels that meet or approximate the reference condition indicate that these aspects of the river channel are recovering following reestablishment of flow.
机译:基西米河的河道化消除了流经河道的水流,从而在河道河床上形成了一个主要的有机沉积层(ODL),并停止了为保持弯道弯头处的点沙而进行的主动砂质运输。 2001年,基西米河修复工程(KRRP)的第一阶段去河道工程的完成,重新建立了流向第一阶段地区河道的水流。这项研究评估了去通道化Ⅰ期后ODL的变化以及活动点棒发展(MBPB)的曲折弯数。评估涉及比较在Ⅰ期地区的水流重新建立后但在KRRP完全完成之前进行的临时测量与(a)在去通道化之前进行的基线测量和(b)根据代表预通道化系统的参考测量值预测的变化。在垂直于河道的固定断面上的岩心样品中测量了ODL厚度。在过渡期间,ODL比基准期间更薄,并且此下降幅度超出了根据参考条件预测的预期变化。 MBPB已通过航空摄影进行了评估。 MBPB从0个折弯的基准测量值增加到2002年的27个折弯和2009年的72个折弯的中期测量值,近似于根据参考条件预测的增加量。 ODL厚度的减少和MBPB的增加达到或达到参考条件的水平表明,河道的这些方面在流量重新建立后正在恢复。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号