首页> 外文期刊>Renewable & Sustainable Energy Reviews >Model selection for continuous commissioning of HVAC-systems in office buildings: A review
【24h】

Model selection for continuous commissioning of HVAC-systems in office buildings: A review

机译:办公大楼HVAC系统连续调试的模型选择:综述

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents an overview of literature and procedures about real-life, state-of-the-art implementations of model-based (MB) Continuous Commissioning (CCx) in office buildings. The focus is on the building- and HVAC-models used for each of three distinct CCx-domains: The identification of energy conserving opportunities (ECOs), fault detection, diagnosis, evaluation and overhaul (FDDe) and model-based control (MBC). For each domain, the relations between chosen model structure, model order, parameter estimation procedure, available sensor data quality and calculation power are highlighted. These insights are critical for office building managers, BEMS manufacturers and researchers involved or interested in the selection and implementation of MBCC strategies.
机译:本文概述了有关办公楼中基于模型(MB)的连续调试(CCx)的现实,最新实现的文献和过程。重点是用于三个不同CCx域的建筑和HVAC模型:识别节能机会(ECO),故障检测,诊断,评估和大修(FDDe)以及基于模型的控制(MBC) 。对于每个领域,突出显示了所选模型结构,模型顺序,参数估计过程,可用传感器数据质量和计算能力之间的关系。这些见解对于参与或对MBCC战略的选择和实施感兴趣的办公楼经理,BEMS制造商和研究人员至关重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号