Project scheduling for constructing biogas plant using critical path method

机译:关键路径法建设沼气厂的项目进度

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Population growth and technological progress have led to increased energy demand. While fossil fuels are currently the main energy resources, they are limited and their combustion causes environmental pollution. Therefore, alternative energy sources should be considered. For this purpose, biogas can be a convenient renewable energy option, which can be produced from organic wastes, e.g. livestock manure and rural wastes which are widely available and accessible. Furthermore, it is considered as a convenient option for rural areas that do not have access to any gas networks. However, managing a large-scale biogas plant construction project demands many coordinated activities with varying durations and involves numerous dependencies. Therefore, this study focuses on application of planning and scheduling for analysis of biogas plant construction project using critical path method (CPM). The results revealed that the minimum completion time of constructing a 50 m(3) biogas plant with fixed dome in Iran would be 38 weeks if no delays postpone the project steps. Also, a project network is proposed to show the relationships between the activities and monitor the progress of the project.
机译:人口增长和技术进步导致能源需求增加。虽然化石燃料目前是主要的能源,但它们受到限制,其燃烧会造成环境污染。因此,应考虑替代能源。为此目的,沼气可以是一种方便的可再生能源选择,它可以由有机废物(例如垃圾)产生。牲畜粪便和农村废物广泛可得。此外,对于无法使用任何天然气网络的农村地区,它被认为是一种方便的选择。但是,管理大型沼气厂建设项目需要许多协调的活动,且持续时间各不相同,并且涉及许多依赖性。因此,本研究着重于计划和调度在应用关键路径法(CPM)分析沼气厂建设项目中的应用。结果表明,如果没有任何延误,则在伊朗建造一座具有固定圆顶的50 m(3)沼气厂的最短完成时间将为38周。此外,建议建立一个项目网络以显示活动之间的关系并监视项目的进度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号