机译:中国BOT电力项目成功的关键因素:火电与风电
School of Business Administration, North China Electric Power University, Beijing 102206, China;
School of Natural and Built Environments, University of South Australia, Adelaide 5001, Australia;
School of Natural and Built Environments, University of South Australia, Adelaide 5001, Australia;
Shandong Nuclear Power Equipment Manufacturing Co. Ltd, Haiyang, Shandong 265118, China;
BOT; critical success factors; China; thermal power project; wind power project;
机译:影响中国BOT电厂项目成功的因素:回顾
机译:蝾螈电动机控制电机控制的热敏度与弹性动力舌头投射
机译:将Kalina循环用作地热发电厂的底部循环:Layang Windu地热电厂的案例研究
机译:南非电力行业内仪器仪表和控制项目成功的关键因素
机译:发展中国家可持续电力部门结构的关键成功因素:Delphi研究。
机译:英国联合唐斯深层地热发电项目的生命周期清单数据及其对电力生产的影响
机译:蝾螈电动机控制电机控制的热敏度与弹性动力舌头投射