Fuzzy TOPSIS method for ranking renewable energy supply systems in Turkey

机译:土耳其可再生能源供应系统排名的模糊TOPSIS方法

获取原文
获取原文并翻译 | 示例
           

摘要

Multi-Criteria Decision Making (MCDM) techniques are gaining popularity in energy supply systems. The aim of this paper is to develop the multi-criteria decision support framework for ranking renewable energy supply systems in Turkey. Given the selection of renewable energy supply systems involves many conflicting criteria, multi criteria decision methods (Fuzzy TOPSIS) were employed for the analysis. The Interval Shannon's Entropy methodology was used to determine weight values of the criteria. In this study, alpha = 0.1, 0.5 and 0.9 values based sensitivity analysis were performed. Three alpha-cutting levels were identical to the sequence of alternatives. According to result, the first criterion in preference ranking of renewable energy sources in Turkey is the Amount of Energy Produced, followed by the ranking systems Land use, Operation and maintenance cost, Installed capacity, Efficiency, Payback period, Investment cost, Job creation, and Value of CO2 emission. Thus the multi-criteria analysis showed that the Hydro Power Station is determined to be the most renewable energy supply system in Turkey. Additionally, the Geothermal Power Station, Regulator and Wind Power Station are determined to be the second, third and fourth, respectively. The government of Turkey should invest, in order of priority, in these systems. The government should also evaluate the projects, which are related to these renewable energy resources. (C) 2014 Elsevier Ltd. All rights reserved.
机译:多标准决策(MCDM)技术在能源供应系统中越来越受欢迎。本文的目的是开发用于对土耳其可再生能源供应系统进行排名的多标准决策支持框架。考虑到可再生能源供应系统的选择涉及许多相互矛盾的标准,因此采用多标准决策方法(Fuzzy TOPSIS)进行分析。使用区间香农熵方法确定标准的权重值。在这项研究中,进行了基于α= 0.1、0.5和0.9的敏感性分析。三个alpha剪切级别与替代顺序相同。根据结果​​,土耳其可再生能源优先选择的第一个标准是生产的能源量,其次是土地使用,运营和维护成本,装机容量,效率,投资回收期,投资成本,创造就业机会,和二氧化碳排放价值。因此,多标准分析表明,水电站被确定为土耳其最可再生的能源供应系统。另外,地热发电站,调节器和风力发电站分别确定为第二,第三和第四。土耳其政府应按优先顺序对这些系统进行投资。政府还应评估与这些可再生能源有关的项目。 (C)2014 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号