首页> 外文期刊>Renewable energy >Techno-economic assessment of substituting natural gas based heater with thermal energy storage system in parabolic trough concentrated solar power plant
【24h】

Techno-economic assessment of substituting natural gas based heater with thermal energy storage system in parabolic trough concentrated solar power plant

机译:抛物槽式太阳能集中热电厂用天然气储热系统代替天然气加热器的技术经济评估

获取原文
获取原文并翻译 | 示例
           

摘要

Parabolic-trough (PT) concentrated solar power (CSP) plants are very vulnerable to daily fluctuations in solar radiation. This dependence can be mitigated through a hybridization of solar energy with natural gas based heaters that supply thermal energy during the night or whenever solar irradiance level is dimmed. However, there is more sustainable way for CSP plants to avoid power-generation-outages caused by transient weather conditions, i.e. installation of thermal energy storage (TES). Such a system stores surplus thermal energy provided by solar field during sunny hours and discharges it when the sun is not available. Shams-1 PT plant in Madinat-Zayed, United-Arab-Emirates (UAE) has two natural gas based components, i.e. steam-booster heater and heat transfer fluid (HTF) heater. In the current study, model of Shams-1 was developed and analyzed in the System Advisor Model (SAM) software. It has been attempted to replace the HTF heater with TES. A parametric study has been conducted to determine the size of the TES as well as the solar field such that the specified power target demand would be satisfied. The results of the parametric analysis showed that TES can't completely replace the HTF heater, within reasonable sizes. Nevertheless, consequent simulations depicts that TES increases the capacity factor on one hand and decreases fuel consumption on the other hand. (C) 2014 Elsevier Ltd. All rights reserved.
机译:抛物槽式(PT)集中式太阳能发电厂(CSP)极易受到日照辐射的每日波动的影响。可以通过将太阳能与基于天然气的加热器混合使用来缓解这种依赖性,该加热器会在夜间或每当太阳辐照度变暗时提供热能。但是,对于CSP工厂而言,还有一种更可持续的方式来避免由瞬态天气条件导致的发电中断,即安装热能存储(TES)。这样的系统存储在晴天期间由太阳能场提供的多余热能,并在没有太阳时将其释放。位于阿拉伯联合酋长国Madinat-Zayed(UAE)的Shams-1 PT工厂有两个基于天然气的组件,即蒸汽增压加热器和传热流体(HTF)加热器。在当前的研究中,开发了Shams-1模型并在System Advisor Model(SAM)软件中进行了分析。已尝试用TES替换HTF加热器。已经进行了参数研究,以确定TES的大小以及太阳场,以便满足指定的功率目标需求。参数分析的结果表明,TES无法在合理的尺寸内完全替代HTF加热器。尽管如此,随后的模拟显示,TES一方面增加了容量因子,另一方面减少了油耗。 (C)2014 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号