首页> 外文期刊>Real-time systems >Response Time Driven Scheduling for Programmable Logic Controllers with Network-Based I/O Systems
【24h】

Response Time Driven Scheduling for Programmable Logic Controllers with Network-Based I/O Systems

机译:基于网络的I / O系统的可编程逻辑控制器的响应时间驱动调度

获取原文
获取原文并翻译 | 示例
           

摘要

This paper introduces a scheduling method for a programmable logic controller (PLC) working under a multi-tasking, multi-processor and network-based I/O subsystem environment. We construct a generic architectural and behavioral model of a PLC and extract precise timing constraints. A heuristic algorithm is developed to satisfy the two objectives, timing constraints and low resource occupation at the same time. A synchronization scheme between program execution and data transmission is also developed, which enables the developed algorithm to accommodate multi-processor PLCs. We analyze the performance and implement the proposed method to demonstrate feasibility.
机译:本文介绍了一种在多任务,多处理器和基于网络的I / O子系统环境下工作的可编程逻辑控制器(PLC)的调度方法。我们构建PLC的通用体系结构和行为模型,并提取精确的时序约束。开发了一种启发式算法来同时满足时序约束和低资源占用这两个目标。还开发了程序执行和数据传输之间的同步方案,这使开发的算法能够适应多处理器PLC。我们分析性能并实施所提出的方法以证明可行性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号