...
首页> 外文期刊>Railways Illustrated >FGW Pacers get up to speed
【24h】

FGW Pacers get up to speed

机译:FGW步行者加快步伐

获取原文
获取原文并翻译 | 示例
           

摘要

First Great Western Trains now has 11 of the 12 Class 142 Pacers received in the recent unit reshuffle in service. The exception is prototype 142001 which is said to be suffering from defective compressors and other faults. It has also had a number of parts removed since its arrival in the West Country to keep the rest of the fleet in traffic. FGW has commenced some limited upgrading of the ex-Northern units and have begun a programme to re-upholster the seating, paint the toilet walls and fit emergency lighting sticks and hammers. It is said that some of the company's drivers are unhappy with cab conditions and have referred problems with fumes and poor heating for attention.
机译:在最近的改组中,第一大西部列车现在拥有12个142级步行者中的11个。原型142001是个例外,该原型据说有压缩机故障和其他故障。自从到达西方国家以来,它还拆除了许多零件,以保持其余机队的通行。 FGW已开始对前北方单位进行一些有限的升级,并已开始了一项计划,对座椅进行重新装饰,对马桶墙壁进行粉刷并安装应急照明棒和锤子。据说该公司的一些驾驶员对驾驶室条件不满意,并提到油烟和加热不良的问题引起注意。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号