...
首页> 外文期刊>Railways Illustrated >...Despite new EMUs entering service
【24h】

...Despite new EMUs entering service

机译:...尽管有新的动车组投入使用

获取原文
获取原文并翻译 | 示例
           

摘要

Some of the many new EMUs awaiting approval in Germany finally entered service in March. Safety case approval for the FLIRT EMUs operated by BLB in early March for services between Salzburg and Berchtesgaden resulted in almost immediate removal of the stand-in loco hauled trains and DMUs that had been providing a temporary service.rnIn mid-March Eurobahn services between Hamm and Monchengladbach were taken over by the fleet of five-car FLIRTs enabling replacement of the Classrn185-hauled stand in trains.
机译:许多等待德国批准的新动车组中的某些动车组终于在三月份投入使用。 3月初,BLB为萨尔茨堡和贝希特斯加登之间的航班运营的FLIRT EMU的安全案例批准,导致几乎立即拆除了提供临时服务的机车牵引火车和DMU。五门FLIRT车队接管了门兴格拉德巴赫(Monchengladbach)和门兴格拉德巴赫(Monchengladbach),从而取代了列车上用Classrn185牵引的展位。

著录项

  • 来源
    《Railways Illustrated》 |2010年第6期|p.81|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号