...
首页> 外文期刊>Railways Illustrated >Progress on Dunboyne relay
【24h】

Progress on Dunboyne relay

机译:Dunboyne接力的进展

获取原文
获取原文并翻译 | 示例
           

摘要

Tracklaying has started at the Southern end of part of the former Midland Great Western Railway (MGWR) route from Drogheda to Navan where a new park and ride station is being built at Pace, just North of Dunboyne.rnWork on rebuilding the 41/2 mile line began in December 2008 and it is on schedule for completion in the second half of 2010. The MGWR route to Navan closed in April 1963 but the sectionrncurrently being reopened was retained as a siding as far as Fairyhouse Halt, just North of the station now being built at Pace, for the storage of wagons until it was lifted in 1965.
机译:从德罗赫达(Drogheda)到纳文(Nvan)的前米德兰大西部铁路(MGWR)路线的一部分的南端开始进行铺轨,在邓博恩(Dunboyne)北部的佩斯(Pace)正在建设新的公园和乘车站。rn重建41/2英里的工作该线路于2008年12月开始,按计划于2010年下半年完成。通往纳文的MGWR路线于1963年4月关闭,但目前重新开放的路段一直保留到现在车站北边的Fairyhouse Halt。在佩斯(Pace)建造,用于存放货车,直到1965年被取消。

著录项

  • 来源
    《Railways Illustrated》 |2010年第1期|p.82|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号