...
首页> 外文期刊>Railways Illustrated >Kildare route project meetings
【24h】

Kildare route project meetings

机译:基尔代尔路线项目会议

获取原文
获取原文并翻译 | 示例
           

摘要

Iarnrod Eireann held a series of public consultation meetings between April 12-14 over plans for stage two of the Kildare Route Project. This phase envisages the quadrupling of the Cork mainline from Inchicore to where the four tracks constructed under phase one begin at Cherry Orchard. As well as installing two extra tracks the project also proposes to electrify the route from Inchicore to Hazelhatch in order to deliver DART services and also to provide a new junction at Inchicore to separate DART services from Intercity and regional services bound for Heuston.
机译:Iarnrod Eireann在4月12日至14日之间就基尔代尔路线项目第二阶段的计划举行了一系列公众咨询会议。此阶段设想将软木干线从Inchicore翻两番,到第一阶段建造的四条轨道从樱桃果园开始。除安装两条额外的轨道外,该项目还建议使从Inchicore到Hazelhatch的线路电气化,以提供DART服务,并在Inchicore提供新的路口,以将DART服务与城际和前往Heuston的区域服务分开。

著录项

  • 来源
    《Railways Illustrated》 |2011年第6期|p.87|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号