...
首页> 外文期刊>Railways Illustrated >Construction of last 378s underway
【24h】

Construction of last 378s underway

机译:最后的378座建筑正在进行中

获取原文
获取原文并翻译 | 示例
           

摘要

Construction of the final three class 378s for services with London Overground has commenced at Bombardier's Derby Works.Numbered 378255-257 the units are an additional order and are intended for Clapham Junction services. They are expected to be delivered during the first part of 2011.Meanwhile the additional cars for the three-car class 378/0s continue to be completed and are being added to sets as they become available. The latest to return to Derby have been 378023/024, which will emerge as 378223/224.
机译:庞巴迪的德比工厂已开始为伦敦陆上基地的最后三类378s建造工程,编号378255-257是另外的订单,旨在用于克拉珀姆交界处的服务。它们预计将在2011年上半年交付。与此同时,三厢378/0级别的其他车辆仍将继续完工,并在可用时添加到套件中。返回德比的最新消息是378023/024,将显示为378223/224。

著录项

  • 来源
    《Railways Illustrated》 |2011年第1期|p.23|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号