...
首页> 外文期刊>Railways Illustrated >Last 334s enter for overhaul
【24h】

Last 334s enter for overhaul

机译:最后334秒钟进入检修

获取原文
获取原文并翻译 | 示例
           

摘要

The scheme to refurbish and repaint ScotRail's fleet of Alstom Class 334 EMUs is reaching its end with the admission of 334004/006 to Shields depot during the month. With the release of 334005 during August only 334012 remains to be dealt with and once this is done the whole class will be in the Saltire blue livery. The refurbishment work has also included interior upgrades and the replacement of the inner gangways as well as a full repaint. It has been jointly carried out at the depot and by Brodie Rail in Kilmamock.
机译:计划对ScotRail的阿尔斯通334类EMU的机队进行翻新和重新上漆的计划即将结束,该月该公司将334004/006的产品纳入Shields仓库。随着8月334005的发布,只有334012尚待处理,一旦完成,整个班级将在萨尔特蓝制服中。翻新工程还包括内部升级,内部舷梯的更换以及全面的重新油漆。它是在仓库和基尔马莫克的布罗迪·拉伊(Brodie Rail)共同进行的。

著录项

  • 来源
    《Railways Illustrated》 |2014年第10期|11-11|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号