【24h】

News and Moves

机译:新闻与动向

获取原文
获取原文并翻译 | 示例
           

摘要

There are still quite a lot of movements taking place, and most firms using industrial locos have been involved. The shunting duties at Celsa, Cardiff have been contracted to GBRf, with the main work undertaken by Class 08s supplied by Harry Needle Railroad Company. However, track in some parts of the works is not in very good condition and needs to be relaid; it is currently 'out of bounds' for the 08s. In orderto use the affected sidings one of the DH50 locos built by Hunslet Engine continues to be used and a swap of the loco took place in October. DH50-2 HE 9377 that had been on short term hire at WH Malcolm, DIRFT Crick, was moved down to Cardiff and DH50-1 HE 9376 was sent to the yard at Barton-under-Needwood.
机译:仍然有很多动作发生,并且大多数使用工业机车的公司都参与其中。加的夫Celsa的调车职责已由GBRf承包,主要工作由Harry Needle Railroad Company提供的08级承担。但是,某些部分的轨道状况不是很好,需要重新布置;目前对于08年代来说是“越界”。为了使用受影响的壁板,Hunslet Engine建造的DH50机车之一继续被使用,机车的更换在10月进行。 DH50-2 HE 9377已在WH Malcolm的DIRFT Crick处短期租用,下移至加的夫,而DH50-1 HE 9376被送往Bared-under-Needwood的船厂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号