【24h】

TRACTION ACTION

机译:牵引动作

获取原文
获取原文并翻译 | 示例
           

摘要

The RHTT season for the York-based Type 1s started on October 16, 2016, but sadly they didn't get off to the best of starts with all four examples failing during the period. 20308 failed with an air leak at Wakefield on October 17 while working with 20312. It was soon discovered that the brakes had been binding on for some time and had caused wheel flats. The 20 was sidelined for repairs until October 27, when it returned to action with 20303. The same problem recurred again that night and the 20 was sent to Derby in the early hours of November 2 for repairs on the wheel lathe.
机译:位于纽约的Type 1赛车的RHTT赛季始于2016年10月16日,但可悲的是,由于在此期间所有四个示例均失灵,他们未能取得最佳开局。 20308在与20312一起工作时于10月17日在韦克菲尔德(Wakefield)漏气。失败后不久,发现制动装置已经束缚了一段时间,并导致车轮变平。 20直到10月27日才恢复维修,直到20303投入使用。当晚再次发生同样的问题,20则在11月2日凌晨被送往德比进行轮式车床的维修。

著录项

  • 来源
    《Railways Illustrated》 |2017年第1期|82-84|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号