...
首页> 外文期刊>Railways Africa >Liebherr To Overhaul HVAC Units Of ETR 700 High Speed Trains
【24h】

Liebherr To Overhaul HVAC Units Of ETR 700 High Speed Trains

机译:利勃海尔大修HVAC单位的ETR 700高速列车

获取原文
获取原文并翻译 | 示例
           

摘要

Liebherr-Transportation Systems has been commissioned by AnsaldoBreda S.p.A.,Naples (Italy) to provide maintenance, repair and overhaul services for 39 cabcooling and 157 saloon air-conditioning systems on board 19 ETR 700 high speedtrains. Each ETR 700 train consists of eight cars and two driver’s cabs and eightsaloon HVAC units are installed in each car.The air conditioning systems have been designed and manufactured by Liebherr.In addition to mandatory examinations, the certified service technicians fromLiebherr-Transportation Systems will also perform on-site repairs on therefrigerant circuits of the air conditioning systems. These measures will furtherenhance the safety, availability and reliability of the HVAC units and consequentlythe travel comfort for both, passengers and the drivers.
机译:利勃海尔运输系统由Ansaldobreda S.P.A委托。, 那不勒斯(意大利)为39个驾驶室提供维护,维修和大修服务 冷却和157个轿车空调系统19 eTR 700高速 火车。 每个ETR 700火车由八辆汽车和两个驾驶室和八个汽车组成 Saloon HVAC单元安装在每辆车中。 空调系统由利勃海尔设计和制造。 除强制性检查外,认证服务技术人员来自 利勃海尔运输系统还将在现场修理 空调系统的制冷剂电路。 这些措施将进一步 提高HVAC单位的安全,可用性和可靠性,从而提高了HVAC单位的安全性,可用性和可靠性 乘客和司机的旅行舒适。

著录项

  • 来源
    《Railways Africa》 |2020年第6期|28-28|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号